Daytona Beach pool builder for oceanfront and riverfront homes
Southern Pool Designs designs and builds custom pools from Ormond Beach to New Smyrna Beach. We engineer them for salt air, beach sand and high water, handle every permit including the state's coastal review, and show you the whole design in 3D with a fixed price before anything is dug.
- Since 1997Building custom pools in Florida
- No. 182026 PSN/Hayward Top 50 Builders
- CPC1461548Florida Certified Pool Contractor
Where your lot sits decides how the pool is built
From the dunes to the Halifax River, a few hundred yards changes who permits the pool, how deep it can go and what it is built to survive. Pick the setting closest to yours.
Oceanfront, seaward of the line
- Who permits it
- Your city or Volusia County, plus the Florida Department of Environmental Protection, which permits work seaward of the Coastal Construction Control Line.
- What it changes
- Under the state's general permit for single-family pools, the pool bottom can sit no more than two feet below existing grade, so most oceanfront pools are partly or fully raised. The sand you dig stays on site, seaward of the line. A soils report decides whether the shell needs pilings.
- Lighting
- From May 1 to October 31, Volusia County requires beachfront lighting to be shielded so it cannot be seen from the beach. We design pool and deck lighting for that from day one.
- Time
- Plan for months, not weeks, for the state review. Lock the design before submitting, because changes restart it.
Beachside, landward of the line
- Who permits it
- Usually only the local building department. Daytona Beach, Daytona Beach Shores, Ormond Beach and Ponce Inlet each permit their own lots, and Ormond-by-the-Sea goes to Volusia County.
- What it changes
- Many peninsula lots sit in a flood zone, which sets where equipment and electrical go. Sand and a high water table mean careful compaction, frequent dewatering and hydrostatic relief in the shell.
- Built for salt and wind
- Corrosion-resistant hardware, an equipment pad kept out of salt spray, and a screen enclosure engineered for coastal wind loads alongside the pool.
Riverfront, on the Halifax or the Indian River
- Who permits it
- The local building department. No state coastal permit in most cases.
- What it changes
- A pool near a seawall is engineered around the wall, and the layout keeps a clear path to the dock. Waterfront lots are often in a flood zone, and soft soil near the river affects excavation.
- Design
- On the beachside, riverfront pools face west across the water at sunset. On the mainland bank they face east toward the sunrise. That decides where the spa and vanishing edge go.
Mainland and golf communities
- Who permits it
- The city or Volusia County, depending on the parcel. A Daytona Beach mailing address does not settle it, so we check the parcel record on the first call.
- What it changes
- In communities such as LPGA International, The Trails or Plantation Bay, association review comes first. Plantation Bay straddles the Volusia and Flagler line, so the county depends on which side your lot is on.
- New homes
- Building a new home? We plan the pool with your builder so grading, utilities and the deck are designed once.
Building now between Ormond Beach and New Smyrna Beach
These are our current and recent Volusia County projects. We list the town and the investment range only, never a client's name or address.
| Where | Project | Investment | Stage |
|---|---|---|---|
| Ormond Beach | Custom pool | $500K to $550K | Gunite shell complete, October 2026 |
| Port Orange | Pool for a new custom home | $325K to $350K | Under construction |
| Ponce Inlet | Oceanfront pool on pilings | $275K to $300K | State coastal permit issued, November 2026 |
| New Smyrna Beach | Pool for a new custom home | $200K to $225K | Pool built, finishing with the home |
| Port Orange | Outdoor kitchen fed from the pool equipment | Not shared | Finished |
The Ponce Inlet pool on pilings
The hardest pool on this coast is the one on the ocean. On a remodeled oceanfront home in Ponce Inlet, the path to a permit went like this:
Soils report
The geotechnical report called for a shell on pilings 15 to 20 feet deep.
Sealed engineering
A structural design for the raised shell, sized to the soils findings.
Town checklist
Two sets of engineering, surveys and plans, setbacks marked on the survey, a pump sizing form, and the barrier fence permit filed first.
Turtle lighting review
The county's sea turtle lighting specialist asked for low-brightness amber light during nesting season.
State coastal permit
Issued in November 2026 after one round of corrections.
What a custom pool on the Daytona coast costs
We publish our ranges because you should know them before you spend an hour with anyone. Your exact price is fixed in writing in your design book, and it does not change unless you change the project.
| Tier | Typical investment | What it usually includes |
|---|---|---|
| Foundation | $120,000 to $175,000 | Classic rectangle or simple freeform, roughly 12×24 to 15×30, pebble or plaster interior, LED lighting, salt system, variable-speed equipment. |
| Signature | $175,000 to $325,000 | Our most-built tier. Custom shape, raised spa or wall, sun shelf, glass tile waterline, travertine deck, full smart automation and heating. |
| Monument | $325,000 to $1,000,000+ | Resort-grade: vanishing or perimeter-overflow edges, complex elevations, multiple water and fire features, natural stone, outdoor kitchens. |
Oceanfront pools usually land in Signature or Monument once raised construction, pilings and the state permit are included. Replacing an older pool adds $8,000 to $20,000 for demolition.
How a project runs
Find the fit, free
An intro call, a design consultation by video, and a site visit. You get a written Site Assessment within 2 business days, whether or not you design with us.
Design it
We laser scan the property and show you the backyard in 3D renders, a fly-through and VR, day and night. Your design fee is credited to construction, and the fixed, itemized price is held for 60 days.
Build it
Sealed third-party structural engineering, every permit, and a dedicated project manager with an update every week. It ends with a final walk, Pool School and a lifetime structural warranty on the gunite shell.
A raised wall like this one, built inland in Apopka, is the same move that makes an oceanfront pool work within the state's grade limits. Why oceanfront pools are raised.
2026 PHTA International Gold for freeform design. 2026 Pinnacle Award from Luxury Pools + Outdoor Living. Ranked No. 18 in the 2026 PSN/Hayward Top 50 Builders.
What clients say about building with us
This is the second pool we've built and the contrast was night and day. The design was amazing. They were very collaborative and worked with us to bring the design we had in mind. The build was great. It was completed on time.
We had a fantastic experience with Southern Pool Design, can't say enough good things about them. We have put in 4 pools and by far this was the best experience we have ever had.
Working with the team at Southern Pool Designs has been such a great experience. They are incredibly professional and always so quick to respond.
5.0 on Google across 100+ reviews of Southern Pool Designs. Read them on southernpooldesigns.com.
Questions from Daytona coast homeowners
Do you build in Daytona Beach Shores and Ormond-by-the-Sea?
Yes. Daytona Beach Shores is its own city with its own building department, and Ormond-by-the-Sea is unincorporated Volusia County, so the county permits it. We confirm who permits your lot from the parcel record on the first call.
How much does an oceanfront pool cost on the Daytona coast?
Our custom pools start at $120,000. Oceanfront pools usually land in our Signature ($175,000 to $325,000) or Monument ($325,000 and up) tiers once raised construction, engineering, pilings if needed and the state coastal permit are included. Our current Volusia builds run from about $200,000 to $550,000.
Why are so many oceanfront pools raised?
Florida's general permit for a single-family pool seaward of the Coastal Construction Control Line limits the pool bottom to two feet below existing grade, or fully above it, and the excavated sand has to stay on site. Designing for that from the first sketch is how a raised pool ends up looking deliberate instead of stuck on.
How long does a custom pool take here?
Most of our pools take 16 to 28 weeks from the first design meeting to the first swim, with 2 to 6 weeks of that in permitting. A beachfront lot that needs the state coastal permit adds months, so we start that review as early as the design allows.
Do you resurface or repair pools?
No. We design and build new custom pools, and we fully tear out and rebuild older ones. Demolition usually adds $8,000 to $20,000 to a rip and replace project.
Where is your office?
Our headquarters and design showroom is at 150 Specialty Point in Sanford, about 45 minutes from Daytona Beach. Intro calls and design consultations happen by phone and video, and we come to your property for the site visit and throughout construction.
Start with a conversation about your lot
Tell us about the property and what you are picturing. A designer will call you to talk it through and set up a design consultation. The first conversation, the site visit and your written Site Assessment are free.
- A short intro call about the lot, your goals and your target investment.
- A design consultation where we pull up your lot and show real work at your investment level.
- A site visit and a written Site Assessment within 2 business days. It is yours to keep.
Prefer to talk? Call (407) 339-5800.